L3 Equipment Replacement

L3 Equipment Replacement at Terminal 5 in Riyadh Airport

LocationRiyadh Airports Company (RAC) Kingdom of Saudi Arabia
DateDecember 2019
CategoryInstitutional

Project Details

One level airport terminal covering 850 sqm.

Role

Preliminary design assessment of the existing steel frames to check the current design conditions. Structural analysis and design calculations for all steels and reinforcements where required. Steel connection designs and verifications. Quantity, weight of each part of additional steel and modeling by design program.

Share: